Drilling Today

Manufacturers Exporters and Suppliers of JCR Series Hammer, Dth Drilling Rigs, Tractor Mounted Dth Drilling Rigs, Trolley Mounted Dth Drilling Rigs, Skid Mounted Dth Drilling Rigs, Dth Rotary Drilling Rigs, Trailer Mounted Dth Drilling Rigs, Mini Dth Drilling Rigs, Hydraulic Dth Drilling Rigs, Hand Pump Dth Drilling Rigs, Water Well Dth Drilling Rigs, Dth Combination Drilling Rigs.

Dth Rotary Drilling Rigs for sale Trailer Mounted Dth Drilling Rigs for saleMini Dth Drilling Rigs for saleHydraulic Dth Drilling Rigs for sale
Hand Pump Dth Drilling Rigs for sale
Water Well Dth Drilling Rigs for sale
Dth Combination Drilling Rigs for sale

Dth Drilling Rigs
Rotary Drilling Rigs
Combination Drilling Rigs
Dth Cum Rotary Drilling Rigs
Blast Hole Drilling Rigs
Core Drilling Rigs
Wagon Drills
Tractor Mounted Drilling Rigs
Reverce Circulation drilling Rigs
Inwell Drilling Rigs
Trailer Mounted Drill Rig
Self Propelled Skid Mounted Rig
Diamond Core Drilling Rig
Mini Truck Mounted Drilling Rig
Hydro Facturing Equipments
Auto Loader DTH Drilling Rig
Hand Pump Drilling Rigs
Trolley Mounted Drill Rigs
Portable Drilling Rigs
Crawler Mounted Down the Hole
Water Well Drilling Rig
Hydraulic Down the Hole, Drilling Rig
Horizontal Drilling Rigs
Dual Rotary Drilling Rigs
Hydra Drills
Auger Drills
Soil Investigation Drilling Rigs
Foundation Drilling Rigs
Geothermal Drilling Rigs


Drilling Today Market Place for - Water Well Drilling Rigs, Dth Drilling Rigs, Rotary Drilling Rigs, Dth Hammers, Button Bits, Upvc Casing Pipes, Mud Pump, Drill Rods, Hydraulic Pumps, Rock Well Hoses, Down the Hole Drilling rigs, Hydraulic Drilling Rigs, Combination Drilling Rigs, Mud Rotary Drilling Rigs, Direct Rotary Drilling Rigs, Blast Hole Drilling Rigs, Down the Hole Hammers Drill Bits Dth Hammers , Carbide Button Bits, Drag Bits, Pdc Drilling Bits, Diamond Bits


Drilling Today Here
Mailing Address:
Drilling Today
House A-145, Shivpuri, Airport Road, Opp. Subodh Girls College, Sanganer, Jaipur 302011 Rajasthan INDIA
Phone: +91 141 2793166
Cell: +91 9414 219 166

Manufacturers and Exporters of Dth Drilling Rigs
DTH Rigs
Diamond Core Drilling Rigs
RC Rigs
MTM Rigs
Hydro Fractering Unit
Blast Hole Drilling
Tractor Mounted Rigs
Refurbished Rigs
Pumping Test Unit
Wagon Drill
JCR Series Hammer
JCR Series Hammer
Hammer Name JCR 4 3/4 JCR 60 JCR 65
Part Number H475JCR H60JCR H65JCR
Outside Dia (mm) 103.00 140.00 148.00
Recomm. Bit size (mm) 120.60 to 140.00 152.40 to 216.00 165.10 to 228.60
To Sub Thread (IN) 2-7/8 Reg Pin 2-7/8 Reg Pin 2-7/8 Reg Pin
Ham. Wt. without Bit (Kg) 40.00 73.50 83.50
Total Len. without Bit (mm) 960.0 1005.0 1005.0
Wrench Flat (mm) 74.00 90.00 90.00
Working Pressure (Bar) 7.5 - 21 10.5 - 24 10.5 - 24
Component Name H475JCR H60JCR H65JCR
Piston Case/Barrel HB475JCR HB60JCR HB65JCR
Control Tube HCT475JCR HCT60JCR HCT60JCR
Top Sub / Back Head HC475JCR HC60JCR HC65JCR
Driver Sub / Front Chuck HFC475JCR HFC60JCR HFC65JCR
Air Distributor HAD475JCR HAD60JCR HAD60JCR
Guide Sleeve / Assembly Bush HAB475JCR HAB60JCR HAB65JCR
Bit Retainer Ring / Bit Lock HBL475JCR HBL60JCR HBL65JCR
Dart / Bonded Check Valve HBCV475JCR HBCV60JCR HBCV60JCR
Retainer Pin / Dowell Pin HDP475JCR HDP60JCR HDP65JCR
O Ring / Assembly Bush O Ring HABOR475JCR HABOR60JCR HABOR60JCR
Front Chuck Rubber Cap HFCRC475JCR HFCRC60JCR HFCRC60JCR
Back Head Rubber Cap HCRC475JCR HCRC60JCR HCRC60JCR

•   For use in hard rock application
•   Valve less DTH Hammer design
•   Reversible wear sleeve(cylinder)
•   Less number of components
•   Can work on low to high pressure radius
•   High rate of penetration while utilising less air
•   Excellent under water characteristics

Before shutting down at the end of each shift, we recommend the following procedures:
  1. Flush Hammer with air/water for a few minutes, then turn off water injection
  2. Flush Hammer with air/oil for a few minutes.  This will coat the internal Hammer parts preventing corrosion/rust.
  3. Never leave the tool in a wet / muddy hole.  Pull back from bottom as far as necessary to prevent the Hammer sitting under water.
  4. It is also good practice to pour at least half a litre of oil down the drill at start up of a new shift.
  5. If the Hammer is removed from the drill rig for any reason, it is wise to pour a quantity of oil into it and block both ends, providing the flushing as outlined in steps one and two above have been carried out.  If steps one and two have not been carried out the Hammer should be stripped, cleaned and oiled before being stored.

Terms and Conditions - Disclaimer Copyright © 2009 dthrotarydrilling.com All rights reserved.